Six precise answers to the most important questions about Aerodrom Berane — the most visionary aviation project in Europe.
Phase 1 of the airport will open in 2029. The entire infrastructure — terminal, runway, control tower and access roads — will be handed over on schedule.

The terminal was designed around the principle of “Zero Friction Travel”. From entrance to gate takes a maximum of 25 minutes — regardless of passenger volume. Every metre of the building follows human-factor studies spanning over 6 years of research.
Wide, barrier-free corridors, intuitive signage in 12 languages, lighting adapted to the time of day, and stress-reducing acoustic zones make Aerodrom Berane the world leader in passenger satisfaction — even before opening.
Aerodrom Berane relies on a next-generation, decentralized energy infrastructure designed for complete self-sufficiency. The entire facility operates on an autonomous, 100% clean power generation system that delivers reliable baseload energy around the clock—independent of external grids, weather conditions, or conventional fuels.
The airport’s infrastructure is supported by an innovative, fully modular and zero-emission power setup that ensures a secure, uninterrupted 24/7/365 operational capability on site
At opening, 11 countries will be available. (Germany, Denmark, Sweden, Liechtenstein, Belgium, Austria, Switzerland, Italy, Turkey, Israel, Dubai, United Arab Emirates)

A new four-lane expressway connects Aerodrom Berane directly to Podgorica in 35 minutes and to the Adriatic coast in 1 hour.
Two premium lounges, 10 shops and restaurants, a directly connected 5-star hotel, a rooftop terrace and an indoor green area. The terminal is not a transit building — it is a destination in its own right.
The airport is the country’s business card. It is the first and last impression passengers get of the country.

Montenegro has made a decision that will change the aviation industry: not to build another average airport, but one of the most innovative and forward-thinking in the world.
Aerodrom Berane is being built where the Adriatic coast meets the mountains — conceived to reflect both: natural vastness and visionary engineering.
The design and planning behind the project — backed by global international references — realizes a fully autonomous, climate-neutral, and high-performance infrastructure for the first time.
No other airport offers this unique combination of decentralized clean power, modern connectivity, emotional architecture, and absolute ecological responsibility.
Every square metre of the terminal follows six years of human-factor research. The result: from entrance to gate in under 25 minutes — guaranteed.
Airport Real-time Intelligence Architecture coordinates all operations in real time: aircraft, baggage, passenger flows and staff — fully automated and adaptive.
Our autonomous energy system delivers continuous zero-emission power directly on site, making Aerodrom Berane completely grid-independent from day one.
Four technologies that redefine aviation operations — and exist nowhere else like this.
Fully document-free travel — from arrival to the aircraft cabin. No airport in the world offers this seamless chain.
A high-speed, low-latency satellite connection powered by Starlink ensures reliable, airport-wide connectivity and seamless real-time data communication across all operations.
An autonomous, 100% clean power generation system coupled with sustainable infrastructure ensures that Aerodrom Berane operates completely carbon-neutral and environmentally friendly.
The AI system ARIA autonomously coordinates all operational processes in real time: flights, passengers, baggage and infrastructure simultaneously.
Register now to be among the first to receive all news about Aerodrom Berane — exclusive job offers, construction updates, and insider previews before anyone else.
No spam. Unsubscribe any time. Your data stays in Montenegro.